LiveGT-2026-004· Listed Mar 19, 2026

Morocco–EU Green Hydrogen & Solar Export

1.4 GW solar PV + 480 MW electrolyser feeding a HVDC link to Iberian grid. EU offtake bankable.

Morocco · Africa Energy & Renewables Infrastructure — Project Finance Closes Jan 31, 2027
Raise Target
$1.20B
Committed
$740.0M
Min Ticket
$10.0M
Target Return
12–14% IRR (USD)
Horizon
15–20 yrs
62% subscribed · $460.0M remaining

Executive Summary

A flagship Africa-Europe energy export corridor combining utility-scale solar, green hydrogen production, and a sub-sea HVDC interconnector. Long-term offtake contracted with two European utilities under a 25-year CfD structure.

Investment Thesis

  • EU Hydrogen Bank and CBAM create durable demand for non-EU green molecules.
  • Site DNI is 2,420 kWh/m²/yr — among the highest in commercially viable geographies.
  • Sovereign-to-sovereign cooperation framework removes cross-border permitting risk.

Use of Funds

Generation (PV + storage)38%
Electrolyser + balance of plant27%
HVDC interconnector26%
Development & contingency9%

Financial Snapshot

Annual revenue (post-COD)
USD 312M
DSCR base case
1.71x
Equity IRR (base)
13.2%
Sponsor IRR with CfD upside
16.5%

Transaction Structure

USD 900M senior debt (DFI + green bond), USD 300M sponsor + co-invest equity (Deal Room slice: USD 120M).

Risk & Mitigation

Key Risks
  • · Sub-sea cable execution
  • · EU policy continuity
  • · Currency translation
Mitigants
  • Tier-1 cable EPC with insurance wrap
  • CfD denominated in EUR with sovereign guarantee
  • Natural USD revenue hedge via DFI debt

Timeline & Milestones

  1. 2024
    Inter-governmental framework signed
  2. 2025
    Site control & FEED
  3. 2026 Q3
    Senior debt commitment
  4. 2027 Q1
    Financial close (equity slice via Deal Room)
  5. 2030
    Phase 1 COD

Sponsor

Saharan Energy Consortium

Saharan Energy Consortium pairs a Moroccan utility, a European energy major, and a sovereign infrastructure fund — combined operational portfolio over 18 GW.

ESG & Impact

  • Avoids ~3.1 Mt CO₂/yr at COD
  • Local content target 47%
  • Community water-positive plan

Data Room

Investor Brief
PDF · 22 pp
Project Information Memorandum
PDF · 240 pp
Verified Access
Independent Engineer Report
PDF
Verified Access
Offtake Agreement Term Sheets
PDF
Verified Access

Gated documents unlock after KYC/AML verification and NDA execution.